Rondo L4-2.4L (2007)
POWER STEERING GEAR BOX
INSTALLATION
1. Install the steering gear box (A) to the sub frame by tightening the mounting bolts.
2. Install the pressure tube (A) and return tube (B) to the steering gear box and then tighten the flare nut.
3. Install the heat protector (A).
4. Install the rear roll stopper (A) to the sub-frame by tightening the mounting bolts.