Rondo V6-2.7L (2009)
7. Insert the cam ring (A) into the pump body.
8. Assemble a new gasket (B) and pump cover (A) to the pump body and then tighten the mounting bolts.
Tightening torque Nm (kgf.m, lb-ft):
15 - 20 (1.6 - 2.0, 11 - 15)
9. Assemble a new O-ring (B) and suction pipe (A) and then tighten the mounting bolts.
10. Assemble the pump pulley (A) to pump shaft and then tighten the nut and spring washer together.
Tightening torque Nm (kgf.m, lb-ft):
54 - 68, 5.5 - 6.9, 40 - 50