kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Removal and Replacement|Page 2887 > < Removal and Replacement
Page 2
background image

Repair Procedures

REAR DIFFERENTIAL CARRIER ASSEMBLY REPLACEMENT PROCEDURE

The content of this article/image reflects the changes identified in Kia Sorento TSB 023.

This bulletin provides an improved rear differential carrier assembly replacement procedure for better serviceability for Sorento (BL) vehicles built from
March 1, 2002 to April 21, 2008. The previous procedure required the removal of the parking brake and the parking brake cable before rear axle shaft
removal. In the improved service procedure, these unnecessary steps have been eliminated making the rear differential assembly replacement procedure
more efficient. Please refer to information below for updated service procedure during rear differential carrier assembly replacement.

NOTICE

Removal and Replacement|Page 2887 > < Removal and Replacement