kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Canister Close Valve <--> [Evaporative Check Valve]|Testing and Inspection|Page 1432 > < Canister Purge Solenoid|Specifications|Page 1428
Page 1
background image

Canister Close Valve: Testing and Inspection

Inspection

1. Measure Canister Close Valve resistance.

Resistance:  Approximately 25 Ohms at 68 °F (20 °C)

2. If not as specified, replace the Canister Close Valve.

Canister Close Valve <--> [Evaporative Check Valve]|Testing and Inspection|Page 1432 > < Canister Purge Solenoid|Specifications|Page 1428