Sportage 2WD 4Dr L4-2.0L (2000)
9. Remove the slide rail.
Installation
1. Position the new slide rail over the existing holes on top of the plastic pad.
2. Install screws No.2 and No.3 into the new slide rail.
3. Install both cross bars with stanchions.
4. Move stanchions to a detent.
5. Install all four end caps.
6. Install new load label.
7. Install screws No.1 and No.4.
Tighten screws to 12 lb-in (1.4 N.m).