Sportage 4WD V6-2.7L (2009)
INSTALLATION
1. Install the lower arm mounting bolts(A).
Tightening torque :
A bushing :
100 - 120 Nm (10 - 12 Kgf-m, 73.8 - 88.5 lb-ft)
G bushing :
140 - 160 Nm (14 - 16 Kgf-m, 103.3 - 118.0 lb-ft)
2. Install the lower arm ball joint mounting bolts(A).
Tightening torque :
100 - 120 Nm (10 - 12 Kgf-m, 73.8 - 88.5 lb-ft)
3. Install the front wheel and tire(A) on the front hub(B).
Tightening torque :
90 - 110 Nm (9 - 11 Kgf-m, 66.4 - 81.2 lb-ft)
CAUTION:
Be careful not to damage the hub bolts(C) then install the front wheel and tire(A).