kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Evaporator Lines|Page 403 > < Evaporator Lines|Page 401
Page 3
background image

4. Install the bulkhead connector mounting bolts and tighten.

Tighten bolts to 18 lb-ft (24 N.m).

5. Install and tighten the small mounting nut.
6. Evacuate the A/C system.

Refer to Recovery/Evacuating/Charging.See: Heating and Air Conditioning/Service and Repair
Perform vacuum test.

7. Charge the A/C system.

Refer to Recovery/Evacuating/Charging.See: Heating and Air Conditioning/Service and Repair
Perform vacuum/leak test.

8. Install battery and reconnect battery cables (negative cable last).
9. Start engine and run the A/C system. Check for leaks at the line connections

10. Remove wheel chocks.

Evaporator Lines|Page 403 > < Evaporator Lines|Page 401