kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Universal Joint, Drive/Propeller Shaft|Testing and Inspection|Page 3181 > < Universal Joint, Drive/Propeller Shaft|Testing and Inspection|Page 3179
Page 2
background image

6. Using a suitable drift punch and hammer, remove the spider bearings.

ASSEMBLY

1. Before assembly, coat the inside of the bearing cap, roller, and grease groove hole of the spider with lithium base grease.

NOTICE:  Align the drive shaft and spider index marks.

2. With drive in a suitable vise, place spider in drive yoke. Using a plastic hammer, tap bearing caps onto spider ends.

3. Place mating yoke over open spider ends and, using a plastic hammer, tap remaining bearing caps onto spider ends.
4. Install new snap rings. All four snap rings must be the same thickness.

INSPECTION

1. Make sure snap rings are completely seated and firm.

Universal Joint, Drive/Propeller Shaft|Testing and Inspection|Page 3181 > < Universal Joint, Drive/Propeller Shaft|Testing and Inspection|Page 3179