landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

All Other Service Bulletins for Electronic Brake Control Module: > < ABS/TCS - Warning Lamp ON/DTC's Set|Page 3483
Page 6
background image

5.

Install the new shuttle valve switch pack from the service kit as follows:

^

Connect the electrical connector.

6

Carefully push the cover into the modulator.

^

Install the three cap-head screws from the service kit and tighten to 4 Nm (3 lbf-ft).

6.

Measure the resistance between pin 9 on the 13-pin modulator connector (C0501-9) and the single adjacent modulator ground pin (C0500-1).

7.

If the resistance value observed is outside the 3020 Ohms +/- 30 Ohms limit, obtain a new ABS modulator and go to the "INSTALLATION AND
FINAL VERIFICATION" section below.

INSTALLATION AND FINAL VERIFICATION

1.

Refer to GTR Section 70.65.49 and install the ABS modulator from the vehicle or the new unit if testing indicated replacement was required.

2.

Clear any logged DTCs using T4 and disconnect the diagnostic equipment from the vehicle.

3.

Road test the vehicle including a number of drive cycles to verify that none of the SVS DTCs return and include the following elements in the road
test:

^

Light acceleration.

^

Light braking.

^

Ignition resets while stationary.

4.

Connect T4 and verify that no SVS DTCs have returned.

5.

Verify that the Internal ECU Data Shuttle Valve Switch Failure Count (ODH LSB) is zero.

6.

If the failure count is not zero or if any SVS DTCs have returned, replace the ABS modulator with a new unit.

Disclaimer

All Other Service Bulletins for Electronic Brake Control Module: > < ABS/TCS - Warning Lamp ON/DTC's Set|Page 3483