Discovery II (LT) V8-4.0L (2002)
5. Fit tool LRT-44-011 to selector shaft.
6. Insert setting pin into tool. Rotate switch until setting pin engages with hole in switch as shown and tighten bolts to 10 Nm (7 ft. lbs.).
7. Remove setting tool LRT-44-01 1.
8. Position selector lever to selector shaft and tighten nut to 26 Nm (19 ft. lbs.).
9. Diesel models: Fit exhaust front pipe.