landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Central Junction Box (CJB)|Page 1268 > < Central Junction Box (CJB)|Page 1266
Page 4
background image

5. Secure the engine harness to the fusebox.
6. Connect the two electrical connectors to the BJB.
7. Install and secure the battery lead to the fusebox and install the small battery lead cover.

Torque: 10 Nm

8. Secure the 3 earth points and secure the harness clips to the vehicle body.

Torque: 10 Nm

9. Secure the battery lead to the battery terminal clamp.

Torque: 25 Nm

10. Install the fuse box cover.
11. Install the harness cover to the suspension turret.
12. Feed harness under the air cleaner duct and secure the duct to the grommet.
13. Secure headlamp and bumper harness clips.
14. Connect the height sensor electrical connector and secure the harness with the clips.
15. Install headlamp mounting plate.

Torque: 10 Nm

16. Connect the side repeater electrical connector.
17. Connect the heated washer jet electrical connection and secure the harness to the vehicle body.
18. Connect the ABS sensor and secure the harness to the vehicle body.
19. Secure the washer pipe to the harness and secure the harness to the body.
20. Connect the crash sensor electrical connectors.
21. Connect the the bonnet lock electrical connector
22. Secure the harness to the body and then secure the bonnet release cable to the harness.
23. Secure the washer pipe to the washer bottle.
24. Install the washer bottle and connect the electrical connections.

Torque: 10 Nm

25. Secure the 3 ground cables to the vehicle body.

Torque: 10 Nm

26. Secure the harness to the vehicle body.
27. Connect the coolant level sensor electrical connector.
28. Install the RH secondary bulkhead mounting bracket.

Torque: 10 Nm

29. Install the inner plenum plate and secure the electrical connector to the plate.
30. Connect the heated screen RH electrical connector.
31. Connect the BBUS electrical connector.
32. Connect the A/C pressure switch electrical connector.
33. Secure the engine compartment harness to the vehicle bulkhead.
34. Secure the harness tray to the LHS of the vehicle bulkhead.
35. Connect the LH heated screen electrical connector and secure the harness to the vehicle body.
36. Feed the harness into the LH wheel arch and secure the grommet.
37. Install the ABS modulator bracket.

Torque: 25 Nm

38. Install the LH side repeater lamp and secure the clips to the vehicle body.
39. Connect the rear washer pipe.
40. Connect the ABS sensor electrical connector and secure the harness to the vehicle body.
41. Connect the two electrical connectors to the CJB.
42. Connect the main engine compartment harness to the instrument panel harness and close the cover.
43. Connect the main engine compartment harness to the headlamp levelling ECU.
44. Connect the 3 floor harness electrical connections.
45. Install the fuse cover and refit the sound deadening sheet.

Central Junction Box (CJB)|Page 1268 > < Central Junction Box (CJB)|Page 1266