landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Central Junction Box (CJB)|Page 7507 > < Central Junction Box (CJB)|Page 7505
Page 12
background image

4. If installed, connect the pollution sensor electrical connector.

^

Install the grommet.

^

Secure the clip.

5. If installed, connect the speed control module electrical connector.
6. Connect the horn electrical connectors.
7. Connect the hood switch electrical connector.
8. RH side: Secure the wiring harness.

^

Secure the clips.

9. Connect both front impact electrical connectors.

^

Secure the clips.

10. RH side: Attach the air suspension pipe.
11. Connect the ambient air temperature sensor electrical connector.
12. RH side: Attach the engine compartment ground cables.

^

Tighten the nuts to 25 Nm (18 ft. lbs.).

13. RH side: Connect the ABS electrical connector.
14. RH side: Attach the body panel ground cables.

^

Tighten the nut to 25 Nm (18 ft. lbs.).

15. RH side: Connect the body panel electrical connectors.

Vehicles with auxiliary heating

1. RH side: Secure the heater pipes to the body panel.

^

Tighten the nut to 10 Nm (7 ft. lbs.).

All vehicles

1. Driver side: Attach the wiring harness to the bulkhead.

^

Install the grommet.

2. Driver side: Connect the lower A-pillar electrical connectors.
3. Install the air suspension control module.
4. Connect the ABS module electrical connector.
5. Connect the brake fluid reservoir electrical connector.
6. Attach the wiring harness to the plenum.

^

Secure the clips.

^

Tighten the nuts to 4 Nm (3 ft. lbs.).

7. Connect the battery to engine compartment wiring harness electrical connector.
8. Connect the A/C pressure transducer electrical connector.
9. Connect the brake booster vacuum pump electrical connector.

10. Attach the hood wiring harness.

^

Install the grommet.

^

Install the cover.

^

Secure with the clips.

^

Connect the electrical connectors.

^

Connect the washer jet hoses.

11. Install the hood pad.

^

Install the clips.

12. Install the windshield wiper motor.
13. LH side: Attach the wiring harness.

^

Install the grommet.

^

Secure the clips.

14. LH side: Connect the brake pad wear sensor electrical connector.
15. LH side: Connect the coolant expansion tank level switch electrical connector.
16. LH side: Attach the washer reservoir wiring harness.

^

Connect the washer jet hoses.

^

Connect the electrical connectors.

17. LH side: Attach the engine compartment ground cables.

Central Junction Box (CJB)|Page 7507 > < Central Junction Box (CJB)|Page 7505