landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Procedures|Page 7559 > < Procedures|Page 7557
Page 6
background image

NOTE: Note the fitted position.

23. Remove the engine wiring harness.

Installation

NOTE: Align to the position noted on removal.

1. Install the engine wiring harness.
2. Connect the CKP sensor electrical connector.
3. Connect the HO2S electrical connectors.
4. Install the electrical harness bridge.

^

Tighten the bolts to 45 Nm (33 ft. lbs.).

5. Connect the breather electrical connector.
6. Connect the PCV electrical connector.
7. Connect the CMP sensor electrical connector.

^

Secure the clip.

8. Connect the cooling fan electrical connector.

^

Carefully secure the clips.

9. Connect the KS electrical connectors.

10. Connect the generator.
11. Connect the ECT sensor electrical connector.
12. Connect the MAF sensor electrical connector.

^

Secure the clip.

13. Connect the fuel injector electrical connectors.

^

Carefully secure the clips.

14. Connect the engine wiring harness.

^

Install the clips on the harness protective cover.

^

Connect and secure the electrical connectors.

15. Install the battery compartment side wall.

^

Secure the clips.

^

Install the battery positive cable and grommet.

16. Install the engine compartment upper heat shield.

^

Secure the clips.

^

Tighten the screw.

17. Install the fusebox main feed cable.

^

Install the bolt and tighten to 10 Nm (7 ft. lbs.).

18. Install the battery.
19. Install the intake manifold.
20. Install the engine undershield.
21. Connect the battery ground cable.

Procedures|Page 7559 > < Procedures|Page 7557