LR3 (LA) V6-4.0L (2006)
21.
Tape the repaired area to within 10 mm (0.40 in) of the new connector. (Figure 7)
22.
Route and secure the overlay harness to original locations.
23.
Connect the new sensor connector to the height sensor.
24.
Refer to Global Technical Reference (GTR) section 414-00, and connect the battery ground cable.
25.
Clear DTCs logged in the air suspension control module.
26.
Verify correct operation of the air suspension system.
Disclaimer