LR3 (LA) V8-4.4L (2009)
44. Disconnect the front LH HO2S and release the clip.
45. Disconnect the RH HO2S and release the clip.
46. Remove the engine wiring harness.
Installation
1. Install the engine wiring harness.
2. Connect the HO2S electrical connectors.
^
Carefully secure the clips.
3. Install the purge valve.
^
Secure the electrical harness with the clip.
^
Tighten the bolt to 6 Nm (4 ft. lbs.).
^
Connect and secure the electrical connector.
4.
Connect the starter motor.
5.
Connect the oil temperature and oil pressure sensors.
6.
Connect the generator electrical connector.
^
Secure the clips.
7.
Connect the CKP sensor electrical connector.
8.
Secure the air compressor electrical connector.
9.
Install the A/C mounting bracket.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
10. Install the power steering pump and mounting bracket.
^
Clean the component mating faces.