LR3 (LA) V8-4.4L (2009)
Clockspring Assembly / Spiral Cable: Description and Operation
Clock Spring
OPERATION
Power Distribution
Feed from the positive battery terminal (C0192) is supplied to fusible link 11E (C0632) on an R wire. Fusible link 11E is located in the Battery Junction
Box (BJB) (C0570) and is connected to the ignition switch (C0028) by an N wire.
When the ignition switch is in the 'ignition' position, current flows across the switch (C0028) to the Central Junction Box (CJB) (C0582) on a Y wire.