landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Procedures|Page 4427 > < Procedures|Page 4425
Page 11
background image

^

Tighten the bolts to 25 Nm (18 ft. lbs.).

11. Secure the transmission cooler pipes into clips.
12. Install the A/C compressor.

^

Tighten the bolts to 25 Nm (18 ft. lbs.).

13. Install the accessory drive belt.
14. Install the upper suspension arm and brake line heat shields.

^

Tighten the nuts and bolts to 10 Nm (7 ft. lbs.).

15. Install the fender splash shield.
16. Install the splash shield.
17. Install the front wheel.

^

Tighten the nuts to 115 Nm (85 ft. lbs.).

18. Connect the cooling fan electrical connector.
19. Connect the cylinder head earth ground connector.

^

Tighten the bolt to 10 Nm (7 ft. lbs.).

20. Connect the EGR valve electrical connector.
21. Install both CMP sensors.

22. Connect the fuel temperature sensor electrical connector.
23. Connect the MAP sensor electrical connector.
24. Connect the KS.
25. Connect the ECT sensor electrical connector.
26. Connect the ignition coil-on-plug electrical connections.

^

Install the clips.

^

Repeat the above procedure for the other side.

27. Connect the fuel injector electrical connectors.

^

Install the clips.

^

Repeat the above procedure for the other side.

28. Connect the VCT oil solenoid electrical connector.

^

Repeat the above procedure for the other side.

29. Install the ignition coil-on-plug cover.

^

Secure the clips.

^

Repeat the above procedure for the other side.

30. Connect the MAF sensor electrical connector.
31. Connect the throttle body electrical connector.

^

Secure the clips.

32. Connect the MAP sensor electrical connector.

33. Install the wiring harness support bracket.

^

Tighten the bolts to 10 Nm (7 ft. lbs.).

34. Connect the engine wiring harness.

^

Install the clips on the harness protective cover.

^

Connect and secure the electrical connectors.

35. Install the battery compartment side wall.

^

Secure the clips.

^

Install the battery positive cable and grommet.

36. Install the fusebox main feed cable.

^

Install the bolt and tighten to 10 Nm (7 ft. lbs.).

37. Install the engine compartment upper heat shield.

^

Secure the clips.

^

Tighten the screw.

38. Install the battery.

Procedures|Page 4427 > < Procedures|Page 4425