LR3 (LA) V8-4394cc 4.4L (2005)
17.
Using a hot air gun, carefully apply heat until around both ends of the sleeve until glue appears at both ends. (Figure 6)
18.
Ensure the 'heatshrink' has completely sealed around the circumference of the wire sheathing of both connector wires.
19.
Repeat steps 7-19 to wires at pins 4 and 5 of the vehicle harness and overlay harness connectors.
20.
After completing the splice to all three pin wires, discard the damaged sensor connector/section of harness.