landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Campaign - Various Vehicle Systems Upgrades|Page 5241 > < Campaign - Various Vehicle Systems Upgrades|Page 5239
Page 12
background image

1. Release the upper tailgate support strut from the D-pillar ball stud. (Figure 1)
2. Remove the ball stud assembly from the body.
3. Apply liquid thread-lock (STC50552/Loctite 242) to the ball spigot thread.
4. Install the ball spigot.
5. Tighten to 23Nm (17 lbf.ft).
6. Install the upper tailgate support.

ENVIRONMENTAL BOX (E-BOX) SEALING GROMMET

LR3 (LA)

VIN: 5A000259 to 6A374589

CAUTION:  the software download must be completed and WDS/IDS disconnected before undertaking this repair. Always observe Workshop
Manual precautions when disconnecting the battery.

1. If the E-box grommet was determined to not be located correctly during the inspection above, perform the following:
^

Disconnect and remove the battery for access.

^

Install the grommet. (Figure 2)

^

Install the battery and connect battery leads.

2.

Remove fender protection covers, and close the hood.

SOFTWARE UPDATE INSTRUCTIONS

CAUTION:  The CCF must be uploaded from the vehicle successfully at session start to avoid problems during programming. If this is not
possible, programming the vehicle SHOULD NOT CONTINUE until the CCF issue has been resolved.

NOTE:  When each module is selected for programming from within this reassurance menu, the tester WILL NOT read the vehicle CCF just prior
to the module software selection and download as it now does for all other programming procedures.

1. Verify that the CCF data was successfully read from the vehicle.
2. Select the Control Modules to be programmed in sequence:

^

Engine Control Module: (Petrol PCM)

^

Heating and Ventilation Control Module: (HVAC)

^

Instrument Pack: (IPK)

^

Ride Level Control Module: (RLM)

^

Transfer Case Control Module: (TCCM)

^

Transmission Control Module: (TCM)

3. When each module has completed its program cycle, record the programming in the appropriate box on the record keeping page.

NOTE:  After successfully programming the Ride Level Control Module, the Reassurance Program sequence DOES NOT request a ride height

Campaign - Various Vehicle Systems Upgrades|Page 5241 > < Campaign - Various Vehicle Systems Upgrades|Page 5239