Range Rover SE (LP) V8-4.0L (1995)
Oxygen Sensor: Recalls
Recall - Catalytic Converter Replacement
No:
D236
Ref:
Issue:
1
Date:
01/04/02
RECALL
Catalyst Inspection and Replacement
AFFECTED VEHICLE RANGE:
Range Rover (LP)
SA302054 to VA350101 (Phase I)
VA350102 to VA376578 (Phase II)
SITUATION:
CATALYST DEGRADATION CAN LEAD TO NOISE AND MIL ILLUMINATION
A defect that relates to vehicle emissions exists on 1995 through 1997 model year Range Rover 4.0/4.6 vehicles imported by Land Rover North America,
Inc.
Range Rover customers may experience a rattle from the underside of the vehicle. In some instances they may also experience a MIL illumination. The
symptoms result from loose catalyst "bricks" within the exhaust system catalysts.
RESOLUTION:
INSPECT CATALYST PIPE MARKINGS AND REPLACE IF INDICATED
Utilizing the inspection parameters in this TIB, determine if the vehicle catalysts are within the affected build range. Both the exhaust down pipe/catalyst
assemblies and the oxygen sensors must be replaced on vehicles equipped with the original design catalyst that is prone to deterioration.
NOTE:
Some vehicles within the affected VIN range may have had repairs under normal warranty provisions. These vehicles may already have correct
updated replacement catalyst assemblies.
PARTS INFORMATION:
NOTE:
Parts numbers with a "K" suffix are intended for Recall repairs only. All parts in the Recall parts listing must be used for each repaired vehicle. Any
retailer found to have abused this stipulation will be subject to audit. Parts orders will be monitored to ensure appropriate parts usage.
WCD000860K
Down pipe assembly
Qty 1
FX110047L
Flange nut
Qty10
ESR3260
Gasket
Qty 2
NV108041L
Nut
Qty2
ANR3643
Set screw
Qty 2
ERR1834K
Oxygen sensor Qty 4
Up to VA350101
AMR6244K
Oxygen sensor Qty 4
VA350102 - VA376578
LRN0002LABEL
Recall Label
Qty 1 Note order quantity 1=100 labels
WARRANTY CLAIMS:
D236 (Option 1)
Time 0.20 hrs.
Inspect down pipe/catalyst assembly
D236 (Option 2)
Time 1.50 hrs
Inspect down pipe/catalyst and replace along with oxygen sensors
Normal warranty policy and procedures apply.
Material allowance is included in labor operation.
REPAIR PROCEDURE