lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Variable Valve Timing Actuator > < Engine Mount Control Solenoid|Locations|Page 2065
Page 3
background image

2. INSTALL NO. 1 AIR CLEANER INLET
3. INSTALL AIR CLEANER INLET ASSEMBLY
4. INSTALL V-BANK COVER SUB-ASSEMBLY
5. INSTALL ENGINE ROOM SIDE COVER LH
6. INSTALL COOL AIR INTAKE DUCT SEAL
7. INSTALL ENGINE UNDER COVER RH
8. INSTALL ENGINE UNDER COVER LH
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

10. PERFORM INITIALIZATION

a. Perform initialization procedure.

NOTE:  Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.

Variable Valve Timing Actuator > < Engine Mount Control Solenoid|Locations|Page 2065