lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Compression Check > < Component Inspection|Page 2107
Page 6
background image

NOTE:  Make sure that the O-ring is not cracked or jammed when installing the oil control valve.

c. Connect the camshaft timing oil control valve connector.

4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Intake Side)

a. Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

b. Install the camshaft timing oil control valve with the bolt.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

NOTE:  Make sure that the O-ring is not cracked or jammed when installing the oil control valve.

c. Connect the camshaft timing oil control valve connector.

5. INSTALL INTAKE AIR SURGE TANK
6. INSTALL NO. 1 AIR CLEANER INLET
7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
8. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
9. INSTALL AIR CLEANER INLET ASSEMBLY

10. INSTALL FRONT SUSPENSION UPPER CENTER BRACE
11. ADD ENGINE COOLANT
12. CHECK FOR ENGINE COOLANT LEAKS
13. INSTALL V-BANK COVER SUB-ASSEMBLY
14. INSTALL ENGINE ROOM SIDE COVER LH
15. INSTALL ENGINE ROOM SIDE COVER RH
16. INSTALL COOL AIR INTAKE DUCT SEAL
17. INSTALL ENGINE UNDER COVER RH
18. INSTALL ENGINE UNDER COVER LH

Compression Check > < Component Inspection|Page 2107