lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Component Inspection|Page 2212 > < Component Inspection|Page 2210
Page 5
background image

a. Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

b. Install the camshaft timing oil control valve with the bolt.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

NOTE:  Make sure that the O-ring is not cracked or jammed when installing the oil control valve.

c. Connect the camshaft timing oil control valve connector.

3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Exhaust Side)

a. Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.

b. Install the camshaft timing oil control valve with the bolt.

Torque: 10 N.m (102 kgf.cm, 7 ft.lbf) 

Component Inspection|Page 2212 > < Component Inspection|Page 2210