lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3514 > < Initial Inspection and Diagnostic Overview|Page 3512
Page 13
background image

Step 2

INSPECTION PROCEDURE

NOTE:

-

Turn the engine switch off before measuring the resistances of CAN bus main wires and CAN bus branch wires.

-

After the engine switch is turned off, check that the key reminder warning system and light reminder warning system are not in operation.

-

Before measuring the resistance, leave the vehicle as is for at least 1 minute and do not operate the engine switch, any other switches, or the
doors. If any doors need to be opened in order to check connectors, open the doors and leave them open.

Navigation ECU Communication Stop Mode

Navigation ECU Communication Stop Mode

DESCRIPTION

HINT:  "AVN" refers to the circuit that includes the multi-display.

Initial Inspection and Diagnostic Overview|Page 3514 > < Initial Inspection and Diagnostic Overview|Page 3512