ES 350 V6-3.5L (2GR-FE) (2007)
f.
Connect the union to check valve hose. (*1)
g. Connect the No. 1 ventilation hose. (*2)
h. Install the clamp and connect the throttle with motor body assembly connector. (*3)
i.
Connect the vapor feed hose. (*4)
j.
Connect the 2 water by-pass hoses to the throttle with motor body assembly. (*5)
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
5. ADD ENGINE COOLANT
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. CHECK FOR ENGINE COOLANT LEAKS
8. CHECK FOR FUEL LEAKS
9. INSTALL V-BANK COVER SUB-ASSEMBLY
10. INSTALL FRONT SUSPENSION CENTER UPPER BRACE
11. INSTALL ENGINE ROOM SIDE COVER RH
12. INSTALL ENGINE ROOM SIDE COVER LH
13. INSTALL COOL AIR INTAKE DUCT SEAL
14. PERFORM INITIALIZATION
a. Perform initialization procedures
HINT: Some systems need initialization after reconnecting the cable to the negative battery terminal.