ES 350 V6-3.5L (2GR-FE) (2007)
5. REMOVE COOL AIR INTAKE DUCT SEAL
6. REMOVE ENGINE ROOM SIDE COVER LH
7. REMOVE ENGINE ROOM SIDE COVER RH
8. REMOVE V-BANK COVER SUB-ASSEMBLY
9. REMOVE FRONT SUSPENSION UPPER CENTER BRACE
10. REMOVE AIR CLEANER INLET ASSEMBLY
11. REMOVE AIR CLEANER CAP SUB-ASSEMBLY
12. REMOVE AIR CLEANER CASE SUB-ASSEMBLY
13. REMOVE NO. 1 AIR CLEANER INLET
14. REMOVE INTAKE AIR SURGE TANK
15. SEPARATE FUEL TUBE SUB-ASSEMBLY
16. REMOVE INTAKE MANIFOLD
17. REMOVE KNOCK CONTROL SENSOR
a. Disconnect the 2 knock control sensor connectors.
b. Remove the 2 bolts and 2 knock control sensors.
INSTALLATION
1. INSTALL KNOCK CONTROL SENSOR
a. Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)
b. Connect the 2 knock control sensor connectors.
2. INSTALL INTAKE MANIFOLD
3. CONNECT FUEL TUBE SUB-ASSEMBLY
4. INSTALL INTAKE AIR SURGE TANK