ES 350 V6-3.5L (2GR-FE) (2007)
(c)
Connect the connector to the TCM.
(d) Turn the lock lever and secure the connector with the lock lever.
2. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
3. INSTALL NO. 1 AIR CLEANER INLET
4. INSTALL AIR CLEANER INLET ASSEMBLY
5. INSTALL BATTERY
6. INSTALL COOL AIR INTAKE DUCT SEAL
7. PERFORM TCM REGISTRATION
8. PERFORM INITIALIZATION
(a)
Perform initialization procedure.
NOTICE: Some systems need initialization after reconnecting the cable to the negative battery terminal.