GS 300 L6-3.0L (2JZ-GE) (1993)
(b) Using SST 09213-70010, 09330-00021, install and torque the bolt.
Torque: 324 Nm (3,300 kg.cm., 239 ft.lb.).
8. Install camshaft timing pulleys.
(a) Align the camshaft knock pin with the groove on the pulley, and slide on the timing pulley.
(b) Temporarily install the timing pulley bolt.
(c) Using SST 09960-10010 (09962-01000) to hold the pulley torque the pulley bolt.
Torque: 79 Nm (810 kg.cm., 59 ft.lb.).
9. Set No.1 cylinder to TDC/compression.
(a) Turn the crankshaft pulley, and align its groove with the timing mark "0" of the No.1 timing belt cover.
NOTICE: Always turn the crankshaft clockwise.