Removing Timing Belt for the 1993 GS 300 L6-30L (2JZ-GE)
17. Install radiator assembly.
(a) Place the radiator assembly on the body bracket.
(b) Install the radiator with the 2 upper radiator supports and 2 nuts.
Torque. 12 Nm (120 kg.cm., 9 ft.lb.).
HINT: After installation, check that the rubber cushion (A) of the support is not depressed.
(c) Connect the following hoses:
(1) Reservoir tank inlet hose to radiator.
(2) Lower radiator hose to water inlet.
(3) Upper radiator hose to water outlet.
(4) 2 A/T oil cooler hoses to oil cooler pipes.
(d) Connect the electric cooling fan connector and wire.
(e) Connect the ECT switch (for electric cooling fan) connector and wire.
18. Install water pump pulley, fan with fluid coupling and drive belt.
(a) Align the matchmarks, and install the water pump pulley and fan fluid coupling with the 4 nuts.