GS 300 L6-3.0L (2JZ-GE) (1993)
-
Install a new gasket and the Exhaust Gas Recirculation Pipe with the two bolts.
Torque: 21 Nm (15 ft lb)
-
Tighten the union nut.
Torque: 64 Nm (47 ft lb)
4. Reinstall the engine wire and heater water valve to cowl panel.