GS 300 L6-3.0L (2JZ-GE) (1993)
VSV Inspection - Checking Operation
-
Check that the air flows from pipe E to pipe G.
VSV Inspection - Checking Operation
-
Apply battery voltage across the terminals.
-
Check that the air flows from pipe E to the filter. If operation is not as specified, replace the Vacuum Switching Valve.
5. Reinstall Vacuum Switching Valve.
-
Install the Vacuum Switching Valve with the screw.
-
Install the Data Link Connector 1 bracket and Vacuum Switching Valve assembly with the bolt.
-
Connect the 2 vacuum hoses to the Vacuum Switching Valve.
-
Connect the Vacuum Switching Valve connector.
-
Connect the Data Link Connector 1 to the bracket.