GS 300 L6-3.0L (2JZ-GE) (1993)
-
Place the 6 Injectors together with the Delivery Pipe and 3 bolts in position on the intake manifold.
-
Temporarily install the 3 bolts holding the Delivery Pipe to the intake manifold.
-
Check that the Injectors rotate smoothly. HINT: If Injectors do not rotate smoothly, the probable cause is incorrect installation of O-rings.
Replace the O-rings.
-
Position the Injector connector upward.
-
Tighten the 3 bolts holding the Delivery Pipe to the intake manifold.
Torque: 21 Nm (15 ft lb)