GS 300 L6-3.0L (2JZ-GE) (1993)
11. Install Exhaust Gas Recirculation pipe.
-
Temporarily install the union nut of the Exhaust Gas Recirculation pipe.
-
Install a new gasket and the Exhaust Gas Recirculation pipe with the 2 bolts.
Torque: 21 Nm (15 ft lb)
-
Tighten the union nut of the Exhaust Gas Recirculation pipe.
Torque: 64 Nm (47 ft lb)
12. Install intake air connector pipe.
-
Install the air connector pipe with the 2 hose clamps.
-
Connect the following hoses:
PS air hose to air connector pipe (1).
PCV hose to No. 2 cylinder head cover (2).
13. Connect the following control cables to Throttle Body.
Accelerator cable (1)
A/T throttle control cable (2)
Cruise control actuator cable (3)
14. Fill engine with coolant.
15. Connect cable to negative terminal of battery.