GS 300 L6-3.0L (2JZ-GE) (1993)
Throttle Body: Service and Repair
Installation
PROCEDURE
1. Install Throttle Body.
-
Install a new gasket to the intake air connector.
-
Slide the Throttle Body onto the stud bolts on the intake air connector.
-
Connect the following hoses:
Water bypass hose from water outlet (1)
Water bypass hose (from No. 2 water bypass pipe (2)
-
Install the Throttle Body with the 2 bolts and 2 nuts.
Torque: 21 Nm (15 ft lb)
-
Install the water bypass hose (the No. 2 water bypass pipe) to the clamp on the engine hanger.