GS 300 L6-3.0L (2JZ-GE) (1993)
7. Install Exhaust Gas Recirculation pipe.
-
Temporarily install the union nut of the Exhaust Gas Recirculation pipe.
-
Install a new gasket and the Exhaust Gas Recirculation pipe with the 2 bolts.
Torque: 21 Nm (15 ft lb)
-
Tighten the union nut of the Exhaust Gas Recirculation pipe.
Torque: 64 Nm (47 ft lb)
8. Install the Data Link Connector 1 bracket and Vacuum Switching Valve assembly (California only) with the bolt.
9. Connect the following hoses:
-
Power Steering air hose to air intake chamber (1)
-
Vacuum sensing hose to air intake chamber (2)
-
Vacuum sensing hose to Fuel Pressure Regulator.
10. Connect the Vacuum Switching Valve connector (California only).
11. Connect the Data Link Connector 1 to the bracket.
12. Connect cable to negative terminal of battery.