GS 300 L6-3.0L (2JZ-GE) (1993)
-
Install the Throttle Body with the 2 bolts and 2 nuts.
Torque: 21 Nm (15 ft lb)
-
Install the water bypass hose (from the No. 2 water bypass pipe) to the clamp on the engine hanger.
-
Connect the following hoses:
4 vacuum hoses (1)
Air hose from intake manifold (California only) (2)
-
Connect the following connectors:
Throttle Position Sensor connector (1)
Sub-Throttle Position Sensor connector (w/TRAC) (2)
Sub-throttle actuator connector (w/ TRAC) (3)
Idle Air Control Valve connector (4)
5. Install Throttle Body bracket with the 4 nuts.
Torque: 21 Nm (15 ft lb)
6. Install intake air connector pipe.
-
Install the air connector pipe with the 2 hose clamps.