GS 300 RWD V6-3.0L (3GR-FSE) (2006)
2. INSTALL INTAKE MANIFOLD
3. INSTALL INTAKE AIR SURGE TANK
4. CONNECT FUEL MAIN TUBE
5. CONNECT VENTILATION HOSE
6. CONNECT UNION TO CHECK VALVE HOSE
7. INSTALL ENGINE REAR COVER
8. CONNECT HEATER WATER OUTLET HOSE
9. CONNECT HEATER WATER INLET HOSE
10. CONNECT WATER BY-PASS HOSE
11. CONNECT COLD START INJECTOR
12. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
13. CONNECT NO. 2 VENTILATION HOSE
14. ADD ENGINE COOLANT
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
16. CHECK FOR ENGINE COOLANT LEAKS
17. CHECK FUNCTION OF THROTTLE BODY
18. INSTALL V-BANK COVER
19. INSTALL ENGINE ROOM SIDE COVER RH
20. INSTALL COOL AIR INTAKE DUCT SEAL
21. INSTALL ENGINE UNDER COVER
22. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
23. WARM UP ENGINE
a. After the engine is warmed up, check that the maintained parts operate normally.