GS 300 RWD V6-3.0L (3GR-FSE) (2006)
20. INSTALL COOL AIR INTAKE DUCT SEAL
21. INSTALL V-BANK COVER
22. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
23. DRIVING TEST
a. After the engine is warmed up, perform the driving test. Then check that the oil control valve operates normally.