GS 300 RWD V6-3.0L (3GR-FSE) (2006)
h. Using a screwdriver, bend the tabs of the lock washer.
i.
Install the transmission control shaft lever RH with the nut.
Torque: 16 Nm (163 kgf-cm, 12 ft. lbs.)
j.
Connect the park/neutral position switch connector.
2. INSTALL ENGINE REAR MOUNTING MEMBER
3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUBASSEMBLY
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. ADJUST SHIFT LEVER POSITION
6. INSPECT SHIFT LEVER POSITION
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
8. INSTALL PROPELLER W/CENTER BEARING SHAFT ASSEMBLY
9. INSTALL FRONT EXHAUST PIPE ASSEMBLY
10. INSTALL ENGINE UNDERCOVER AIR GUIDE BRACKET
11. ADD AUTOMATIC TRANSMISSION FLUID
12. INSTALL ENGINE UNDER COVER NO. 2
13. CHECK FOR EXHAUST GAS LEAKS
14. PERFORM INITIALIZATION