GS 300 RWD V6-3.0L (3GR-FSE) (2006)
1. INSTALL STARTER ASSEMBLY
a. Install the starter with the 2 bolts.
Torque: 58 N.m (591 kgf.cm, 43 ft.lbf)
b. Install the starter cable with the nut, and then attach the terminal cap.
Torque: 4.0 N.m (41 kgf.cm, 35 in.lbf)
c. Connect the starter connector.
2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
a. Install a new gasket and the manifold with 6 new nuts.
Torque: 21 N.m (214 kgf.cm, 15 ft.lbf)
b. Connect the A/F sensor connector (bank 1 sensor 1.)