GS 300 RWD V6-3.0L (3GR-FSE) (2006)
5. INSTALL TIE ROD END LH
a. Install the lock nut and the tie rod end to the rack end until the matchmarks are aligned.
HINT: After adjusting toe-in, torque the lock nut.
6. INSTALL TIE ROD END RH
HINT: Perform the same procedure as for the LH side.
INSTALLATION
1. INSTALL POWER STEERING LINK ASSEMBLY
a. Install the power steering link assembly with the 2 bolts, 2 washers and 2 nuts.
Torque: 118 Nm (1,200 kgf-cm, 87 ft. lbs.)
b. Install the power steering earth wire to the power steering link assembly with bolt (B).
Torque: 5.0 Nm (51 kgf-cm, 44 inch lbs.)
c. Connect wire harness connector (E) to the power steering link assembly and securely lock the connector.