GS 300 RWD V6-3.0L (3GR-FSE) (2006)
d. Connect 2 wire harness connectors (C) and (D) to the power steering link assembly.
e. Install the 2 wire harness clamps to the power steering link assembly.
f.
Connect the earth wire to the bracket with bolt (A).
Torque: 8.0 Nm (82 kgf-cm, 71 inch lbs.)
2. CONNECT TIE ROD END LH
a. Connect the tie rod end LH to the steering knuckle with the nut.
Torque: 65 Nm (663 kgf-cm, 50 ft. lbs.)
b. Install a new clip.
NOTICE: If the holes for the clip are not aligned, tighten the nut up to 60° further.
3. CONNECT TIE ROD END RH
HINT: Perform the same procedure as for the LH side.
4. CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY NO. 2
a. Align the matchmarks on the intermediate shaft assembly No. 2 and the power steering link assembly.
b. Install bolt (A) and tighten the 2 bolts.
Torque: 35 Nm (360 kgf-cm, 26 ft. lbs.)