GS 300 RWD V6-3.0L (3GR-FSE) (2006)
3. INSPECT SHIFT SOLENOID VALVE S2
a. Measure the resistance according to the value(s) in the table.
Standard Resistance
b. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body
OK: The solenoid makes an operating noise.
4. INSPECT SHIFT SOLENOID VALVE S3
a. Measure the resistance according to the value(s) in the table.
Standard Resistance
b. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
OK: The solenoid makes an operating noise.
5. INSPECT SHIFT SOLENOID VALVE S4
a. Measure the resistance according to the value(s) in the table.