GS 350 AWD V6-3.5L (2GR-FSE) (2009)
Main Relay (Computer/Fuel System): Service and Repair
Installation
2GR-FSE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION
INSTALLATION
1. INSTALL INTEGRATION RELAY
(a) Connect the 3 connectors.
(b) Attach the integration relay to the engine room No. 2 relay block.
(c) Install the engine engine room No. 1 relay block cover.
2. INSTALL ENGINE ROOM SIDE COVER LH See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. PERFORM INITIALIZATION
(a) Perform initialization See: Testing and Inspection/Programming and Relearning.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.