GS 350 AWD V6-3.5L (2GR-FSE) (2009)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
OK:
The solenoid makes an operating noise.
4. INSPECT SHIFT SOLENOID VALVE (S3)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
OK:
The solenoid makes an operating noise.
5. INSPECT SHIFT SOLENOID VALVE (S4)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.