GS 350 AWD V6-3.5L (2GR-FSE) (2009)
Assembly/Installation
23. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
24. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
25. PERFORM INITIALIZATION
(a) Perform initialization See: Testing and Inspection/Programming and Relearning.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
26. INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT See: Relays and Modules/Relays and
Modules - Steering and Suspension/Relays and Modules - Steering/Steering Control Module/Service and Repair/Power Steering ECU/Installation