lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Control Module, A/T > < A760H Automatic Transmission|Page 4009
Page 5
background image

9. INSPECT SHIFT SOLENOID VALVE (SLU)

(a) Measure the resistance according to the value(s) in the table below.

Standard resistance:

(b) Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and check

operation of the valve.
NOTE:
While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may
occur.

OK:
The solenoid makes an operating sound.

Control Module, A/T > < A760H Automatic Transmission|Page 4009