lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Relays and Modules - Brakes and Traction Control > < On-Vehicle Inspection|Page 6916
Page 5
background image

9. INSTALL ENGINE ROOM RELAY BLOCK NO.3

10. ADD BRAKE FLUID
11. CONNECT BATTERY NEGATIVE TERMINAL
12. INSTALL COWL TOP VENTILATOR LOUVER SUBASSEMBLY
13. INSTALL FRONT FENDER TO COWL SIDE SEAL LH
14. INSTALL FRONT FENDER TO COWL SIDE SEAL RH
15. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH
16. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH
17. INSTALL FRONT PILLAR TO FRONT SIDE SEAL SUB-ASSEMBLY LH
18. INSTALL FRONT PILLAR TO FRONT SIDE SEAL SUB-ASSEMBLY RH
19. ADD RESERVOIR WITH BRAKE FLUID
20. BLEED MASTER CYLINDER
21. BLEED BRAKE LINE
22. BLEED ABS AND TRACTION ACTUATOR ASSEMBLY
23. INSPECT FLUID LEVEL IN THE RESERVOIR
24. INSPECT BRAKE FLUID LEAKAGE
25. INSPECT ABS AND TRACTION ACTUATOR ASSEMBLY
26. INSTALL COOL AIR INTAKE DUCT SEAL
27. INSPECT BRAKE PEDAL HEIGHT
28. INSPECT PEDAL FREE PLAY
29. INSPECT PEDAL RESERVE DISTANCE
30. INSTALL INSTRUMENT PANEL AIR BAG ASSEMBLY NO.1 LOWER
31. INSTALL INSTRUMENT PANEL SAFETY PAD NO.1 SUB-ASSEMBLY
32. INSTALL INSTRUMENT PANEL UNDER COVER NO.1 SUB-ASSEMBLY
33. INSTALL INSTRUMENT SIDE PANEL LH
34. INSTALL FRONT DOOR OPENING TRIM COVER LH
35. INSTALL FRONT DOOR SCUFF PLATE LH
36. INSTALL INSTRUMENT PANEL FINISH PANEL END LH
37. INSTALL CONSOLE UPPER PANEL SUB-ASSEMBLY
38. INSTALL CONSOLE UPPER PANEL GARNISH FRONT
39. INSTALL ENGINE ROOM COVER SIDE
40. INSTALL ENGINE ROOM SIDE COVER LH
41. INSPECT VSC SENSOR SIGNAL
42. INSPECT SRS WARNING LIGHT
43. PERFORM INITIALIZATION

Some systems need initialization after reconnecting the cable to the negative battery terminal.

Relays and Modules - Brakes and Traction Control > < On-Vehicle Inspection|Page 6916