GS 350 RWD V6-3.5L (2GR-FSE) (2007)
a. Connect the water hose.
b. Attach the clamp on the clamp track portion of the hose.
4. INSTALL HEATER BLOWER WIRE
a. When replacing the engine block heater bracket:
Connect the bracket to the heater blower wire connector.
b. Install the wire with the 2 bolts and connect the connector.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE: When the bracket is tightened by the bolt, make sure there is a safe amount of clearance between the bracket end and the water hose
joint surface.
5. INSTALL WATER BY-PASS GLOW PLUG
6. CONNECT HEATER BLOWER WIRE
7. INSTALL ENGINE REAR COVER
8. INSTALL V-BANK COVER
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
10. ADD ENGINE COOLANT
11. WARM UP ENGINE
12. CHECK FOR ENGINE COOLANT LEAKS
13. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.