GS 350 RWD V6-3.5L (2GR-FSE) (2007)
b. Install the charcoal canister with the 2 spacers and 4 nuts.
Torque: 14.7 N.m (150 kgf.cm, 11 ft.lbf)
c. Connect the 2 quick connectors, hose and connector.
NOTE:
-
Check for damage or foreign objects on the connected part.
-
After connecting, check that the vent hose and the valve are securely connected by pulling on them.
d. Connect the wire harness with the 2 clamps.
2. INSTALL FLOOR UNDER COVER